Virtualization · VMware to Hyper-V
VMware to Hyper-V migration services
IT Perfection moves virtual machines from VMware ESXi to Microsoft Hyper-V for businesses in Orange County. The new hosts are sized and built, each virtual machine is converted and tested, and the old platform stays available until you confirm the move.



Is this you?
When a move from VMware to Hyper-V makes sense
- Your VMware renewal quote is much higher than before
- Your Windows Server licenses already include Hyper-V
- The ESXi hosts are due for replacement anyway
- Your version of ESXi or vCenter is out of support
- You run a few hosts and do not use the advanced VMware features
- You want one platform your Windows administrators already know
What changes
What is different after the move
Your servers, data and addresses stay the same. The platform underneath them changes.
- Virtual disks change from VMDK files to VHDX files
- Management moves from vCenter to Hyper-V Manager, Failover Cluster Manager or Windows Admin Center
- Backup jobs are rebuilt for Hyper-V and the first restores are tested
- Monitoring and alerts are pointed at the new hosts
- Windows virtual machines may need to be activated again
- VMware subscriptions can be left to expire once the old hosts are retired
Hyper-V is a role in Windows Server, so there is no separate hypervisor subscription. The Windows Server licenses for the hosts must cover the virtual machines that run on them, and the Standard and Datacenter editions differ in how many they cover. We work this out in the design so the quote shows the full picture.
If you depend on features or appliances that only run on VMware, or the platform is well run and the renewal cost is acceptable, a move may not pay for itself. We compare both paths for your environment before you decide.
Scope of work
What the migration includes
A migration is a sequence of small, tested moves, not one big switch.
Inventory and fit check
We list every virtual machine with its operating system, disks, memory, network and what depends on it. Anything that will not convert cleanly is found now, such as very old operating systems, USB license keys or appliances supplied only for VMware, and gets its own plan.
Host and storage sizing
The Hyper-V hosts are sized from what your virtual machines actually use, with room for growth and for one host being down. Where the existing servers are supported for the Windows Server version you will run and still have useful life, we tell you whether they can be reused.
Building Hyper-V
Windows Server and the Hyper-V role are installed, virtual switches and VLANs are set to match your network, and storage is laid out for the virtual disks. Backups and monitoring are working on the new platform before the first production machine moves.
Converting the virtual machines
Snapshots and VMware Tools are removed first. Each machine is then shut down, its disks are converted from the VMware format to the Hyper-V format, and it is started on the new host. The network adapter is set up again with the same addresses and the machine is checked before users return.
Domain controllers and special servers
Some servers are better rebuilt than converted. For domain controllers we normally add a new one on Hyper-V and retire the old one, which is cleaner than converting it. Database and line-of-business servers are moved with the software vendor's requirements in hand.
Testing and rollback
After each move we test sign-in, shared folders, applications, printing and backups with you. The original virtual machine stays on VMware, powered off and untouched, until you confirm the new one, so going back means starting it again.
Project plan
How a VMware to Hyper-V migration runs
Review
We list the virtual machines, hosts, storage, licensing and anything tied to VMware.
Design
You get the Hyper-V design, host sizing, a migration order and a written quote.
Build
Hyper-V hosts, networking, storage, backups and monitoring are installed and tested.
Migrate
Machines move one at a time, least critical first, with a backup before and a test after.
Handover
You get documentation, working backups and admin accounts in your name.
Every engagement starts with a written scope and a clear quote, so you know the expected cost before work starts. How pricing works
Handover pack
What you have at handover
A working Hyper-V platform and the paperwork to run it.
- A list of every virtual machine with its host, resources and purpose
- A diagram of hosts, storage, virtual switches and VLANs
- The backup setup for Hyper-V, with the date of the last tested restore
- A record of what was converted, what was rebuilt and why
- A Windows Server licensing summary for the hosts and virtual machines
- Admin accounts in your company's name
Conversions run in the evening or at the weekend where possible, one workload at a time, so each server is tested before staff need it.
The VMware hosts are not wiped on cutover day. They stay available for an agreed period. After that the data on them is removed and the hardware is reused or retired.
Platforms and tools
Platforms we work with
Free guides from our IT library on this topic:

Who does the work
Ali Hassani, CISO
IT Perfection is led by Ali Hassani, who has 25+ years of experience in IT operations, Microsoft infrastructure, networking and cybersecurity. Design, implementation and troubleshooting work is planned and reviewed by Ali personally.








Need an independent security audit, compliance readiness or vCISO support instead? IT Perfection handles design, implementation and day-to-day IT; OC Security Audit is the related cybersecurity brand for audits, compliance readiness and vCISO work.
Larger or multi-vendor project?
We run it under IT project management: one written plan, one point of contact, vendors coordinated, and a tested rollback for every cutover.
Related work
Related virtualization services
FAQ
VMware to Hyper-V migration: common questions
How long does a VMware to Hyper-V migration take?
It depends on the number of virtual machines and how much data they hold. A small environment can often be moved over a few evenings or weekends, and larger ones are spread over several weeks. The schedule is written into the quote.
Will there be downtime?
Each virtual machine is off while its disks are converted and it is started on Hyper-V. That window is scheduled outside working hours where possible, and its length depends mainly on the size of the disks.
Can we reuse our existing servers as Hyper-V hosts?
Often, if the hardware is supported for the Windows Server version you will run and still has useful life. Because the servers are in use by VMware during the move, reuse normally means freeing one host first and moving in stages. We check this in the review.
Do Linux virtual machines move too?
Yes. Current Linux distributions include the drivers Hyper-V needs. Older ones may need an update before the move, and we test each one after conversion.
What happens to our backups?
Backup jobs are tied to the platform, so they are set up again for Hyper-V. We confirm that your backup software supports Hyper-V, run the first backups and test a restore. Backups taken on VMware are kept for the retention period you choose.
Do we need new Windows Server licenses?
It depends on what you own. Windows Server is licensed by the processor cores in each host, and the edition decides how many Windows virtual machines each license covers. We compare what you have with what the new hosts need, and you confirm the result with your license provider.
Is Hyper-V as reliable as VMware?
Both are mature platforms that run business servers well. Hyper-V includes live migration, failover clustering and replication. What matters more is that the hosts, storage, networking and backups are designed and maintained properly.
Can you work alongside our IT team?
Yes. We can run the whole project, or handle the design and conversions while your team looks after users and applications. See co-managed IT.
What does it cost?
The price depends on the number of virtual machines, the amount of data and whether new hosts are needed. After the review you get a written scope and quote before any work starts. How pricing works.
Move off VMware in small, tested steps.
Start with the free 30-minute review. No obligation, and you leave with a clear list of what is fine and what needs attention.
On site across Orange County: Irvine · Newport Beach · Costa Mesa · Tustin · Santa Ana · Lake Forest · Anaheim · Fountain Valley
